Service processThe current position:主页 > English > Service project > Service process >

Design service

Time:2021-11-14 16:07 Author:admin Click:

All kinds of design services can be contracted.
A. Ship repair and conversion design. B. Ship and offshore engineering design. C. Other engineering design.
1)Additional document of BWMP for meeting D2 requirements. 1)All kinds of size for barge detail and production design. 1) Preliminary scheme planning and design of various small special ships.
2)The longitudinal strength calculation for existing vessel. 2)2000t rock riprap vessel detail and production design. 2)Animation demonstratoin design.
3)The incling experiment outline and report for passenger vessel. 3)100t fishery administration vessel detail and production design. 3)Advertising plan design.
4)The hydrostatic roll test outline and report for small vessel. 4)12.4m breeding recreational vessel detail and production design. 4)Sheet metal design.
5) The emergency oil pollution prevention plan(SOPEP) for bulk carrier. 5)30m leisure fishery watch vessel detail and production design. 5)Product appearance design.
6)The ship emergency towing manual. 6)30t anchor handling vessel detail and production design. 6)Strength calculation and optimization of steel structure.
7)The SOLAS training/maintenance manual. 7)30m bottom recreational fishing net cage detail and production design. 7)Security point layout design.
8)The ship fire fighting operation training manual. 8)38m grab dredger vessel detail and production design. 8)Indoor and outdoor scene renderings.
9)The ship fire fighting operation training plan. 9)10500t self unloading coal carrier vessel detail and production design. 9)Geological map and groundwater flow field analysis.
10)The ship's in-water rescue manual. 10)The small jack up platform detail and production design. ...
11)The ship's in-water survey manual(IWSM). 11)All kinds of size pontoon bridges detail and production design.  
12)The permanent means of access(PMA) manual. 12)Cargo ship hatch cover production design.  
13)The ship to ship operation manual. 13)The hull structure production design.  
14)The calculation of standards for the rate of discharge of untreated sewage from ship. 14)The steel plate nest cutting order design.  
15)The ship pollution prevention calculation. 15)The expansion for complex curved surface structure.  
16)The navigation visible line.  ...  
17)The hazardous area division plan.    
18)The sacrificial anode calculation.    
19)The power load calculation.    
20)The sewage storage tank design.    
21)The lower sulfur oil(MGO) storage tank design.    
22)The shore power system design.    
23)The design for small cargo ship convent to fresh water supply ship.     
24)The English version loading manual is translated in to Chinese.    
25)The English version ballast water management plan is translated in to Chinese.    
26)The English version fire control plan is translated in to Chinese.    
27)The Existing drawing is drawn into CAD format.    
...